Gujranwala Electric Power Company (GEPCO) is a leading electricity distribution company in Pakistan, serving districts like Gujranwala, Sialkot, Gujrat, Mandi Bahauddin, Hafizabad, and Narowal. With the growing demand for new homes and businesses, securing a GEPCO new connection has become a priority for many residents and entrepreneurs. This guide provides a detailed, step-by-step process for applying for a GEPCO new connection, including required documents, fees and tracking.
Applying for a GEPCO new connection is straightforward, whether you choose the online or manual method. Below is a detailed guide to ensure a smooth application process.
Before applying, confirm your eligibility based on your property type, location, and intended electricity usage. You can check eligibility by visiting GEPCO's official website or contacting their helpline at 118.
Having the necessary documents ready is critical to avoid delays. All documents should be scanned in JPEG or PDF format for online applications and provided in hard copy for manual submissions.
Document | Description |
---|---|
Proof of Ownership | Registry, allotment letter, or lease agreement proving property ownership or tenancy. |
CNIC Copies | Attested copies of the applicant's and a witness's Computerized National Identity Card (CNIC). |
Neighbor's Bill | A copy of the electricity bill of a nearby property for reference. |
Wiring Test Report | A report from a licensed wiring contractor confirming the safety of the electrical setup. |
Undertaking | A signed statement declaring no previous connection or arrears at the property. |
GEPCO offers two ways to apply for a new connection:
For online applications:
For manual applications, obtain the form from a GEPCO office, fill it out accurately, and attach hard copies of the required documents.
Once your application is reviewed, GEPCO will issue a demand notice outlining the connection charges. The fee varies based on the connection type and distance from the nearest electric pole.
Connection Type | Estimated Cost (PKR) | Includes |
---|---|---|
Single-Phase | 10,500 | Meter installation, up to 40 meters of wiring |
Three-Phase | 43,000 | Meter installation, up to 40 meters of wiring |
Additional wiring charges may apply if the property is farther than 40 meters from the power supply.
GEPCO will conduct a site survey to assess the feasibility of the connection. After verifying the payment and documents, technicians will install the meter and connect it to the grid. The entire process typically takes about 30 days for residential connections, though complex installations may take longer.
You can monitor your application status online:
The process typically takes about 30 days for residential connections, provided all documents and payments are complete. Complex installations may take longer.
2. What is the cost of a new gepco electricity connection in 2025?The cost is approximately PKR 10,500 for a single-phase connection and PKR 43,000 for a three-phase connection, including taxes and security fees. Additional charges may apply for extended wiring.
3. Can I apply for a GEPCO new connection online?Yes, you can apply through the ENC portal at enc.com.pk. The online process is faster and allows real-time tracking.
4. What documents are required for a GEPCO new connection?You need proof of ownership, attested CNIC copies (applicant and witness), a neighbor's electricity bill, a wiring test report, and an undertaking stating no prior connection or arrears.
6. What happens if my application is rejected?GEPCO may reject applications due to incomplete documents, fake submissions, or unpaid arrears. Ensure all information is accurate and contact GEPCO for clarification if rejected.
For the latest updates on fees and procedures, check GEPCO's official website or contact their customer service.
From Power Generation to Customer Care – GEPCO Lights the Way to a Brighter, More Connected Future.
Your Bill, Your Way - Fast, Safe, and Simple.
بجلی سے متعلقہ تمام شکایات کیلئے 118 پر 24 گھنٹے رابطہ کریں یا 8118 پر میسج کریں
Call Now